Sprint 6 Progress Report

18 Jan 2027 → 29 Jan 2027 · Forensics · Milestone: M2 MVP (29 Jan)

Sprint goal

One sentence agreed at sprint planning.

Planned work

Key Story Owner Pts Status
KAN-85 MVP end-to-end test and M2 demo (29 Jan) T1 3 To Do
KAN-86 Implement candidate ranking v1 with T5 T1 3 To Do
KAN-87 SDK automatic linking by output object identity T2 5 To Do
KAN-88 SDK/backend contract tests T2 3 To Do
KAN-89 Diagnosis and claim models with list/detail APIs T3 5 To Do
KAN-90 Audit log for key/config changes and overrides T3 3 To Do
KAN-101 Datasets API (list/create, add cases) T3 3 To Do
KAN-91 DecisionGate interface and LLM classifier fallback backend T4 8 To Do
KAN-92 Propagation labelling and span roles T5 5 To Do
KAN-93 Explanation model: evidence-cited, injection-safe diagnosis text T5 5 To Do
KAN-94 Failure investigation page T6 8 To Do
KAN-95 Agent faults: wrong tool, malformed args, tool timeout, loop T7 5 To Do
KAN-96 Accuracy harness on dev set: Top-1, Top-3, macro-F1 T7 5 To Do

Planned: 61 points. Completed: ___ points.

Demo

What was shown at the sprint review, with links to recordings.

Burndown

Paste a screenshot of the Jira report or the CSV totals.

Retrospective

Went well To improve Actions (owner)

Risks and blockers

-