Sprint 4 Progress Report

14 Dec 2026 → 23 Dec 2026 · AI Integrations & Detection base (short sprint)

Sprint goal

One sentence agreed at sprint planning.

Planned work

Key Story Owner Pts Status
KAN-63 Publish architecture overview and ADR index in Confluence T1 2 To Do
KAN-64 Token and cost calculation with pricing table T2 3 To Do
KAN-65 Version metadata: pipeline, prompt, component, git commit T2 2 To Do
KAN-66 Celery worker, AnalysisJob model and GET /v1/jobs/{id} T3 5 To Do
KAN-67 Detection pipeline runs on trace completion T4 5 To Do
KAN-68 Evidence store: create EvidenceRef from spans, documents and signals T5 5 To Do
KAN-69 Settings: project and API key management UI T6 3 To Do
KAN-70 Span payload viewer for object-store payloads T6 2 To Do
KAN-71 RAG faults: remove relevant doc, irrelevant docs, corrupt ranking, top-k cutoff T7 5 To Do
KAN-72 Write ADR-007 evaluation methodology T7 3 To Do

Planned: 35 points. Completed: ___ points.

Demo

What was shown at the sprint review, with links to recordings.

Burndown

Paste a screenshot of the Jira report or the CSV totals.

Retrospective

Went well To improve Actions (owner)

Risks and blockers

-