Sprint 5 Progress Report¶
4 Jan 2027 → 15 Jan 2027 · Detection
Sprint goal¶
One sentence agreed at sprint planning.
Planned work¶
| Key | Story | Owner | Pts | Status |
|---|---|---|---|---|
| KAN-73 | Post-holiday scope checkpoint toward M2 | T1 | 2 | To Do |
| KAN-74 | Design candidate ranking score with T5 | T1 | 3 | To Do |
| KAN-75 | Helpers for retrieval and tool auto-instrumentation | T2 | 5 | To Do |
| KAN-76 | SDK quickstart guide | T2 | 3 | To Do |
| KAN-77 | Flags endpoint and POST /v1/traces/{id}/analyses | T3 | 5 | To Do |
| KAN-78 | Rate limits and request size limits | T3 | 3 | To Do |
| KAN-102 | Platform metrics and correlation-id logging | T3 | 3 | To Do |
| KAN-79 | Statistical checks: latency, cost and token anomalies | T4 | 5 | To Do |
| KAN-80 | LLM judge: answer faithfulness to evidence | T4 | 5 | To Do |
| KAN-81 | RCA v1: backward traversal using quality deltas | T5 | 8 | To Do |
| KAN-82 | Flag button and analysis progress UI | T6 | 3 | To Do |
| KAN-83 | Failures list page | T6 | 5 | To Do |
| KAN-84 | Agent benchmark app (C) v1 with planner and tools | T7 | 8 | To Do |
Planned: 58 points. Completed: ___ points.
Demo¶
What was shown at the sprint review, with links to recordings.
Burndown¶
Paste a screenshot of the Jira report or the CSV totals.
Retrospective¶
| Went well | To improve | Actions (owner) |
|---|---|---|
Risks and blockers¶
-