Sprint 3 Progress Report¶
30 Nov 2026 → 11 Dec 2026 · Trace Platform · Milestone: M1 Vertical slice (11 Dec)
Sprint goal¶
One sentence agreed at sprint planning.
Planned work¶
| Key | Story | Owner | Pts | Status |
|---|---|---|---|---|
| KAN-50 | Vertical slice integration and M1 demo (11 Dec) | T1 | 3 | To Do |
| KAN-51 | Generate TypeScript types from OpenAPI in CI and fail on drift | T1 | 2 | To Do |
| KAN-52 | Trace assembly on completion: derived totals, structure validation | T2 | 5 | To Do |
| KAN-53 | SDK-side redaction of secrets and configured PII patterns | T2 | 3 | To Do |
| KAN-54 | OpenAI adapter with automatic LLM spans | T2 | 5 | To Do |
| KAN-55 | Store large payloads in object storage by reference | T3 | 3 | To Do |
| KAN-56 | Trace query API: list, filter, detail with spans and links | T3 | 5 | To Do |
| KAN-57 | Seed script for demo project and sample traces | T3 | 2 | To Do |
| KAN-58 | Rules: extracted value appears in source, citation exists | T4 | 5 | To Do |
| KAN-59 | RCA v0: backward walk to earliest operational error | T5 | 5 | To Do |
| KAN-60 | Trace explorer DAG with React Flow | T6 | 8 | To Do |
| KAN-61 | Timeline view and span detail drawer | T6 | 5 | To Do |
| KAN-62 | RAG benchmark app (B) v1 instrumented | T7 | 8 | To Do |
Planned: 59 points. Completed: ___ points.
Demo¶
What was shown at the sprint review, with links to recordings.
Burndown¶
Paste a screenshot of the Jira report or the CSV totals.
Retrospective¶
| Went well | To improve | Actions (owner) |
|---|---|---|
Risks and blockers¶
-