Sprint 3 Progress Report

30 Nov 2026 → 11 Dec 2026 · Trace Platform · Milestone: M1 Vertical slice (11 Dec)

Sprint goal

One sentence agreed at sprint planning.

Planned work

Key Story Owner Pts Status
KAN-50 Vertical slice integration and M1 demo (11 Dec) T1 3 To Do
KAN-51 Generate TypeScript types from OpenAPI in CI and fail on drift T1 2 To Do
KAN-52 Trace assembly on completion: derived totals, structure validation T2 5 To Do
KAN-53 SDK-side redaction of secrets and configured PII patterns T2 3 To Do
KAN-54 OpenAI adapter with automatic LLM spans T2 5 To Do
KAN-55 Store large payloads in object storage by reference T3 3 To Do
KAN-56 Trace query API: list, filter, detail with spans and links T3 5 To Do
KAN-57 Seed script for demo project and sample traces T3 2 To Do
KAN-58 Rules: extracted value appears in source, citation exists T4 5 To Do
KAN-59 RCA v0: backward walk to earliest operational error T5 5 To Do
KAN-60 Trace explorer DAG with React Flow T6 8 To Do
KAN-61 Timeline view and span detail drawer T6 5 To Do
KAN-62 RAG benchmark app (B) v1 instrumented T7 8 To Do

Planned: 59 points. Completed: ___ points.

Demo

What was shown at the sprint review, with links to recordings.

Burndown

Paste a screenshot of the Jira report or the CSV totals.

Retrospective

Went well To improve Actions (owner)

Risks and blockers

-