Sprint 1 Progress Report¶
2 Nov 2026 → 13 Nov 2026 · Definition & Architecture · Milestone: M0 Architecture freeze (13 Nov)
Sprint goal¶
One sentence agreed at sprint planning.
Planned work¶
| Key | Story | Owner | Pts | Status |
|---|---|---|---|---|
| KAN-15 | Run kickoff: problem, users, MVP, non-goals, roles | T1 | 2 | To Do |
| KAN-16 | Set up Jira project, board, sprints and Confluence space | T1 | 2 | To Do |
| KAN-17 | Write and approve ADR-001 to ADR-004 | T1 | 5 | To Do |
| KAN-18 | Freeze trace/span/link contract and success-metric targets (M0) | T1 | 3 | To Do |
| KAN-19 | Prototype SDK API shape including inputs_from links | T2 | 3 | To Do |
| KAN-20 | Map span model to OpenTelemetry attributes | T2 | 3 | To Do |
| KAN-21 | Create repository, branch protection, PR and issue templates | T3 | 2 | To Do |
| KAN-22 | Docker Compose stack with PostgreSQL, Redis and MinIO | T3 | 3 | To Do |
| KAN-23 | FastAPI skeleton with config, /health and /ready | T3 | 3 | To Do |
| KAN-24 | CI pipeline: Ruff, mypy, pytest, frontend lint/type/test | T3 | 3 | To Do |
| KAN-25 | Write ADR-005 (Celery) and ADR-006 (capture, retention, privacy) | T3 | 2 | To Do |
| KAN-26 | Implement taxonomy module v1 with definitions | T4 | 3 | To Do |
| KAN-27 | Investigate Jev access and DecisionGate options | T4 | 3 | To Do |
| KAN-28 | Write RCA algorithm design with hand-built fixture traces | T5 | 5 | To Do |
| KAN-29 | Design evidence and claim data model | T5 | 2 | To Do |
| KAN-30 | Scaffold Next.js console with Tailwind, ESLint, Prettier, Vitest | T6 | 3 | To Do |
| KAN-31 | Wireframe Traces explorer and Failures investigation screens | T6 | 5 | To Do |
| KAN-32 | Design benchmark suite and document benchmark | T7 | 3 | To Do |
| KAN-33 | Draft evaluation protocol: metrics, dev/held-out split | T7 | 3 | To Do |
| KAN-34 | Implement InjectedFault schema | T7 | 2 | To Do |
Planned: 60 points. Completed: ___ points.
Demo¶
What was shown at the sprint review, with links to recordings.
Burndown¶
Paste a screenshot of the Jira report or the CSV totals.
Retrospective¶
| Went well | To improve | Actions (owner) |
|---|---|---|
Risks and blockers¶
-